Active vehicles
0/ 16
—
Trips today
0
+14 vs yesterday
Distance covered
0km
as of 09:40 IST
Avg fuel efficiency
0km/l
+0.3 vs plant target
Open alerts
0
2 high severity
On-time performance
91%
Avg trip duration
1h 24m
Distance this month
182,400km
Fleet size
16vehicles
Live fleet map — Gujarat logistics corridor
Live
Plant
Port / warehouse
Loaded run
Return run
Fleet status
16 vehicles
Trips by destination — today
| Trip ID | Vehicle | Driver | Route | Distance | Start | End | Duration | Avg speed | Fuel | Status |
|---|
Today's routes
—
—
Alert log — last 3 days
6 open
SeverityDateEventVehicleTime
Generate trip report
Select a vehicle and date range, then generate a report to preview and download trip history.